Every epoxy floor starts with proper preparation of the concrete, followed by product application in 2 stages.
Large Diamond Grinder/ Shot Blaster for concrete preparation.
We prep concrete evenly and consistently to achieve maximum adhesion.
Properly prepared concrete shown next to unprepared concrete.
Controlling dust during preparation is key. We use industrial standard equipment even at residential jobs.
Applying a thick top coat ensures long lasting epoxy coatings. We apply coatings thicker than industry standard.
Elegant Epoxy coatings are the best in town! Just look at our extensive portfolio!
- Crew(s) arrive at predetermined time
- Work order is reviewed with client
- Diamond grinding begins (dust control used)
- Make saw cut at door line
- Hand-grind front edge
- Vacuuming of Floor
- Repairs made
- Joints Caulked
- Materials Applied (Poly or 100% solids) with roller
- Flake to rejection (over thrown to ensure consistency)
- Work space cleaned
- Garage door left cracked slightly
- Crews arrive at predetermined time
- Flake collection
- Scraping of floor and joints
- Vacuuming
- More Vacuuming
- Touch-ups (if any)
- High Grade Polyaspartic applied at high build
- Anti-slip in every floor
- Garage door left cracked slightly
- 24 hours for items under 500lbs
- 5 days after install, cars can come back in
- 3 days later follow-up / balance request